|
News
- Tendering for Consultancy Services of
Construction and Post-Construction Works of Dwellings
and Building Constructions together with Inter Block
Infrastructure, General Infrastructure and Landscaping
in Balıkesir, Bilecik, Bursa and Çanakkale Provinces
handled by T.R. Prime Ministry Public Housing
Development Administration (TOKİ) has been concluded.
Click for details…
- Design services regarding the Preparation of
Application Projects, Technical Specifications and
Quantity Surveys for Diyarbakır Airport Terminal
Building conducted by General Directorate of State
Airports Authority are still in progress.
Click for details…
-
Consultancy Services for Design
of Model Office Buildings, Preparation of Bidding
Documents and Construction Supervision for Bursa
Regional Directorate’s Building Services are still in
progress.
Click for details…
-
Site supervision services regarding the EIB-CB1.5/B
Istanbul Seismic Risk Mitigation and Emergency
Preparedness Project (ISMEP) are still in progress.
Click for details…
-
Project Coordination and
Implementation Unit Consultancy Services for Ankara -
Istanbul High Speed Train (AIHST) financed by European
Investment Bank is still in progress.
Click for details…
-
Engineering design services of CB1.3/E are still in
progress within the scope of Istanbul Seismic Risk
Mitigation and Emergency Preparedness Project (ISMEP).
Click for details…
|